Lorem ipsum dolor sit amet, consectetuer adipis cing elit. Aenean commodo ligula eget dolor. Aenean massa. Cum sociis theme natoque

Follow Me
TOP
Shutterstock NewLong adeptalgorithms
Product Documentation

BAEVR

Baevr Product Documentation


Day-Long Shuttering Activities (Columns, Walls, Footings etc.)

Day-Long Shuttering Activities (Columns, Walls, Footings etc.)

Method Statements Process Modelling
Modelling column shuttering using box, boards, planks or custom forms in Baevr...
Rate Analysis for Plastering in CM

Rate Analysis for Plastering in CM

Construction Technology Engineers Managers Masonry Parametric Quantity Survey Process Modelling Project Management techniques Rivet Systematic Ways
A calculator for rate analysis of plastering, various cases including special efforts...
Isolated Sloped Footing with Neck Column

Isolated Sloped Footing with Neck Column

Construction Technology Engineers Parametric Quantity Survey Project Management techniques Work Breakdown (BOQ)
Parametric BOQ calculator for isolated sloped footings, excavation, binding and neck column...
Rigid Tile Flooring & Wall Lining

Rigid Tile Flooring & Wall Lining

Masonry Method Statements Process Modelling
Methods of setting, bedding and pointing ceramic, vitrified, stone and cement tiles...
Reinforcement, Bar Bending & Placement

Reinforcement, Bar Bending & Placement

Concrete Construction Technology Process Modelling
Examination of rebars, methods of cutting, bending, binding and placing in position...
Structural Concrete: Modelling

Structural Concrete: Modelling

Concrete Process Modelling
Description of methods and sub-methods for modeling structural concrete works in Baevr...
Carriage Scenarios: Lead, Lift and Load

Carriage Scenarios: Lead, Lift and Load

Construction Technology Equipment Work Breakdown (BOQ)
Details of carriage activities for materials at site to support mainstream works...
Vendor-designed Assemblies

Vendor-designed Assemblies

Technical Reference
A vendor-designed assembly is an activity that comprises of on-site assembly and...
Bored Cast-in-Situ Piling: Work Definition

Bored Cast-in-Situ Piling: Work Definition

Work Breakdown (BOQ)
Also called Drilled Shaft Foundations Major Workgroups: Marking, Piling and Pile-head Chipping....
Drilling Rigs

Drilling Rigs

Construction Technology Equipment Piling Process Modelling
Multi-purpose Equipment for drilling and bailing, driving liners and piles, place concrete...
Productive and Plant Scenarios of Equipment

Productive and Plant Scenarios of Equipment

Technical Reference
Study of contribution of equipment and plant in throughput of construction processes...
Factors of Production and Throughput in Construction

Factors of Production and Throughput in Construction

Technical Reference
Rules for modeling combination of resources to produce output of construction procedures...
1 2

 

About Baevr


Modules & Features in Baevr

Modules & Features in Baevr

Integrated management method that caters to just about every practical situation in construction...
Focus on Cash

Focus on Cash

More construction companies fail due to incorrect financial management than business profitability*...

Register Now!

Join the SetSail community today & set up a free account.